Showing posts with label Flower Bed. Show all posts
Showing posts with label Flower Bed. Show all posts

Friday, January 31, 2014

New Year 2014

MSGC Turf Staff has been working hard this winter doing multiple things around the course
  1. Cut down 35 trees
    1. Limb, Log, and Haul Debris
    2. Grind Stumps
    3. Grade out Stump Holes
  2. Clean up the flood debris
  3. Renovate the right bunker on #10
  4. Renovate #14 Bunker to Grass Bunker
  5. Maintenance of equipment
  6. Renovate Benches
  7. Flower Bed Renovation
  8. Equipment Purchases
With a four man crew year round, this winter has been very busy.

The trees were mostly Ash trees that were infected with Emerald Ash Borer. Those trees were deemed a safety hazard and had to come down. We are planning to incorporate ornamental grasses in key locations where trees have been eliminated to maintain playing standards.

We also had some flood damage from Decembers flood. We have picked up most of that debris and are waiting for snow to melt to pick up the tiny drift garbage.

The right side of #10 bunker had been closed for most of the 2013 season. It will be renovated with white sand and a new drain. We plan on doing a few more if we can get to them in a timely manner.

The back bunker on #14 is getting renovated to a grass bunker. We feel that the bunker is not in play very often, and it can be a maintenance nightmare.

Equipment maintenance is always a winter project. We have spent the better part of a month making sure the equipment will be ready and top notch for the 2014 season. With an older fleet, fine tune maintenance practices are essential to keep the fleet at its best.

Benches around the course have been deteriorating and been vandalized throughout the years. We are staining 12 benches with a cedar stain. We are rebuilding 6 (to see how they look) with a composite redwood that will resist vandalism and degradation from the weather. We look to do the rest of the benches this way if the composite works well. 

The flower bed near the restaurant is being renovated to meet maintenance needs. Ornamental grasses will take the place of the removed Taxis bushes.

We are also getting a new fairway mower this year. It will greatly improve the quality of cut on the fairways and keep them looking great.

As always feel free to email, call, or visit us with questions, comments, or concerns.


Tuesday, December 3, 2013

Winter Work

As all the leaves are down and decomposing, we can focus on our winter work before the new year. We are doing a few things around the course these coming weeks.

  1. Flower bed renovation behind the clubhouse restaurant.
    1. Tearing out 3 Taxis bushes, narrowing the bed, and planting ornamental grasses
  2. Tearing down the shelter at #11 tee
    1. It is rotting and is too low to get carts under for shelter to begin with.
  3. Starting the renovation on the right side bunker of #10
    1. That bunker has been shut down the last half of the year due to degradation of sand and clay.
  4. Cutting some 35 ash trees that are going to be dangerous to play near in the 2014 season.
    1. Emerald Ash Borer is the culprit. 
      1. For more information see: http://www.emeraldashborer.info/#sthash.Cd2G2Yk1.dpbs
There are other jobs that need done but these are the major projects.

The turf has quit growing and is dormant. We will be applying our dormant fertilizer during our warm spell this week. The dormant fertilizer feeds the roots so the turf will overwinter better and come back with a healthy stand of turf immediately when the temps turn in the spring.

We hope everyone had a great Thanksgiving Holiday and stays warm this winter. The signs nature has given us leans towards a rough winter.